The District's Charge for Water and Wastewater Taps and connections, both in District and out of District shall be as follows.  If there is an existing tap, then the following fees will apply.  If no tap exists, then the charge shall be the amount shown plus actual installation costs. 

WATER
 

 

5/8" x 3/4" meter

$1,200.00

1" x 1" meter

$1,600.00

1 ½" x 1 1/2" meter

$3,500.00

2" x 2" meter

$6,000.00

Larger meter (plus actual costs)

$8,000.00

 

WASTEWATER
 

 

4" existing connection

$1,200.00

6" existing connection

$2,400.00

 

 

Acceptable forms of payment include cash, check, MasterCard/Visa, Discover and American Express. 

 