Service »

Permits and Construction

Permit Fee Schedule

WATER/WASTEWATER
  Minimum ten (10) inspections $550.00
  Each additional inspection over ten (10) $55.00
SPRINKLER SYSTEMS
  Minimum two (2) S/S inspections $110.00
  Each additional S/S inspection over two (2) $55.00
SWIMMING POOL
  Minimum two (2) inspections $110.00
  Each additional inspection over two (2) $55.00
REMODELS
  Minimum three (3) inspections $165.00
  Each additional inspection over three (3) $55.00
BACKFLOW PREVENTER RETESTING
  Annual inspection (1) Actual cost by subcontractor
GRINDER PUMP
  Design review $100.00
  Plumbing/mechanical inspection $55.00
  Electrical inspection $55.00
  Start-up/Demonstration $55.00
GREASE TRAP CLEANING
 
Actual cost by subcontractor plus $50 administrative  fee
BACKFLOW PREVENTER FOR  SPRINKLER SYSTEM AND SWIMMING POOL
  Minimum one (1) testing inspection By others
  Each additional inspection over one (1) By others

Acceptable forms of payment include cash, check,  MasterCard/Visa, Discover and American Express.